Projects | North Protection
Project TPP-01: “TE-TO Novi Sad” TPP A1 Unit,   Serbia

Project TPP-01: “TE-TO Novi Sad” TPP A1 Unit,

 

Serbia

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Protective and Monitoring Systems for Thermal Expansion of the Steam Turbine Investor: “Panonske elektrane” Novi Sad, Serbia Object Name: “TE-TO Novi Sad” Thermal Power Plant, A1 Unit Installed Power: 135 MW Object Location: Novi Sad, Vojvodina, Serbia Brief Project...
Project OIS-02: “Subotička Toplana”,   Vojvodina, Serbia

Project OIS-02: “Subotička Toplana”,

 

Vojvodina, Serbia

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection and Monitoring System for Pumps and Fans Investor: “Subotička Toplana” Subotica, Vojvodina, Serbia Object Name: “Subotička Toplana”, rotation machines in the heating plant (pumps and fans) Object Location: Subotica, Vojvodina, Serbia Brief Project Description:  In this project the protection system for vibration and temperature has been implemented. The system based on HS-420 and HS-420T,manufactured by Hansford Sensors, UK has been applied in this case. The protection system has been connected with the existing SCADA Control System of the heating plant. Below is a schematic map of a typical device with the disposition of...
Project HPP-05: EPRS, “Višegrad” HPP, A1, A2, A3 Units, Bosnia and Herzegovina

Project HPP-05: EPRS, “Višegrad” HPP, A1, A2, A3 Units,

 

Bosnia and Herzegovina

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Protection and Condition Monitoring System Investor: “Hidroelektrane na Drini” Višegrad, Bosna i Hercegovina Object Name: “Višegrad” Hydro Power Plant, A1, A2 i A3 Units Installed Power/Turbine Type: 3×105 MW/Kaplan Object Location: Višegrad, Bosnia and Herzegovina Brief Project Description: “Višegrad” HPP has three units with Kaplan type turbines. The total installed power of the power plant is 315MW. This project is realized as part of the modernization of the power plant control system. By now, delivery, installation and commissioning of three GE/BN 3500 Condition Monitoring Systems (CMS) by General Electric have been completed.  Although all three installed systems function as CMS independent of SCADA/DCS, they are also integrated into the power plant control system. Protection levels of vibration are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project is realized jointly by IMP Automatika Ltd, Serbia, NORTH Protection Ltd, NORTH Control Ltd, both Members of the NORTH Group, Serbia and Caldera Ltd, RS, Bosnia and Herzegovina. Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 2. Measurement Line of Relative Shaft Vibration ISO 7919-5 3. Measurement Line of Absolute Stator Core and Generator Housing Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key Phasor 6. Measurement Line of Magnetic Flux 7. Measurement Line of Air Gap 8. Measurement Line of Partial...
Project HPP-04: EPS, “Vrla 2″ HPP 2A and 2B Units,  Serbia

Project HPP-04: EPS, “Vrla 2″ HPP 2A and 2B Units,

 

Serbia

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Implementation of Protection and Vibration Monitoring System – “Turnkey Project” Investor: Electric Power Industry of Serbia, Belgrade, Serbia Object Name: “Vlasinske HE” Surdulica, “Vrla 2″ Hydro Power Plant, 2A and 2B Units Installed Power/Turbine Type: Two Units, Total 24 MW/Francis Object Location: Surdulica, Serbia Brief Project Description: “Vrla 2” HPP has two units with Francis type turbines. The total installed power of the power plant is 24MW. This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two VM-600 monitoring systems by MEGGITT has been completed. Both installed systems function as vibration protection systems independent of SCADA/DCS, however they are integrated into the power plant control system as well. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project is realized jointly by MC-monitoring SA, Switzerland,  IMP Automation & Control Systems Ltd, Serbia, NORTH Protection Ltd and NORTH Control Ltd, both Members of the NORTH Group, Serbia: MC-monitoring SA –  production and delivery of components and assemblies IMP Automation & Control Systems Ltd – project preparation and SCADA/DCS connection NORTH Protection Ltd – installation and commissioning NORTH Control Ltd – quality and quantity control, testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system.   Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4....
Project HPP-03: EPS, “Međuvršje” HPP A1 and A2 Units,  Serbia

Project HPP-03: EPS, “Međuvršje” HPP A1 and A2 Units,

 

Serbia

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection and Monitoring System Investor: “Drinsko-limske HE” Bajina Bašta, Serbia Object Name: “Elektromorava” Čačak, “Međuvršje” Hydro Power Plant, A1 i A2 Units Installed Power/Turbine Type: 2.5MW; 4.5MW/Kaplan Object Location: Čačak, Serbia Brief Project Description: “Medjuvrsje” HPP has two units with Kaplan type turbines. The total installed power of the power plant is 9MW. This project is realized as part of the rehabilitation of the power plant. By now, delivery, installation and commissioning of two Vibration Monitoring Systems (VMS) by Provibtech have been completed. Both installed systems function as vibration protection systems supported by the SCADA/DCS system and are integrated into the power plant control system control system. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project has been realized by the following Members of NORTH Group: NORTH Point – delivery of equipment and project realization NORTH Protection – installation and commissioning NORTH Control – testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key...
Project HPP-02: EPS, “Ovčar Banja” HPP A1 and A2 Units,  Serbia

Project HPP-02: EPS, “Ovčar Banja” HPP A1 and A2 Units,

 

Serbia

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection and Monitoring System Investor: “Drinsko-limske HE” Bajina Bašta, Serbia Object Name: “Elektromorava” Čačak, “Ovčar Banja” Hydro Power Plant, A1 i A2 Units Installed Power/Turbine Type: 2.0MW; 4.0MW/Kaplan Object Location: Čačak, Serbia Brief Project Description: “Ovcar Banja” HPP has two units with Kaplan type turbines. The total installed power of the power plant is 8.26MW. This project is realized as part of the rehabilitation of the power plant. By now, delivery, installation and commissioning of two Vibration Monitoring Systems (VMS) by Provibtech have been completed. Both installed systems function as vibration protection systems supported by the SCADA/DCS system and are integrated into the power plant control system. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project has been realized by the following Members of NORTH Group: NORTH Point – delivery of equipment and project realization NORTH Protection – installation and commissioning NORTH Control – testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key...