Hydro P.P. | North Protection
Project HPP-11: EP BiH, “Jablanica” HPP A6 Unit, Bosnia and Herzegovina

Project HPP-11: EP BiH, “Jablanica” HPP A6 Unit,

 

Bosnia and Herzegovina

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS)   Basic Project Data Project Name:Implementation of Machinery Protection System (MPS) – “Turnkey Project” Investor: PE “Electric Power Industry of Bosnia and Herzegovina”, Sarajevo, Bosnia and Herzegovina Object Name: “Jablanica” HPP, A6 Unit Installed Power/Turbine Type: Six Units, Total 180 MW/Francis Object Location: Jablanica, Bosnia and Herzegovina Brief Project Description: “Jablanica” HPP, A6 unit. This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two Machinery Protection Systems (MPS) by MC-monitoring, CH, type Rhino PMS-300® completed. Both installed systems function as vibration protection systems integrated into the plant control system as well. Protection levels are set according to ISO 7919-5:2005 standard. Machinery Monitoring System, for each of the pumps, has 9 channels, which include monitoring the following dynamic parameters: Shaft relative vibration, number of sensors: 6 according to ISO 7919-5: 2005 Structure absolute vibration, number of sensors: 2 Key phasor/RPM, number of sensor: 1 The project is realized jointly by MC-monitoring SA, Switzerland,  DIT Ltd, Tuzla, Bosnia and Herzegovina, NORTH Protection Ltd and NORTH Control Ltd, both Members of the NORTH Group, Vojvodina, Serbia: MC-monitoring SA –  production and delivery of components, DIT Ltd, Tuzla, Bosnia and Herzegovina – project preparation, MPS and SCADA/DCS connections implemented, NORTH Protection Ltd, Member of NORTH Group – assemblies, installation, commissioning and MPS and SCADA/DCS connection implemented, NORTH Control Ltd, Member of NORTH Group – quality and quantity control, testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration...
Project HPP-10: EPS, “Vrla 3″ HPP 3A and 3B Units,  Serbia

Project HPP-10: EPS, “Vrla 3″ HPP 3A and 3B Units,

 

Serbia

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS)   Basic Project Data Project Name: Implementation of Protection and Vibration Monitoring System – “Turnkey Project” Investor: Electric Power Industry of Serbia, Belgrade, Serbia Object Name: “Vlasinske HE” Surdulica, “Vrla 3″ Hydro Power Plant, 3A and 3B Units Installed Power/Turbine Type: Two Units, Total 27.7 MW/Francis Object Location: Surdulica, Serbia Brief Project Description: “Vrla 3″ HPP has two units with Francis type turbines. The total installed power of the power plant is 27.7 MW. This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two “Rhino PMS-300” monitoring systems by MC-monitoring have been completed. Both installed systems function as vibration protection systems independent of SCADA/DCS, but they are also integrated into the power plant control system as well. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project is realized jointly by MC-monitoring SA, Switzerland,  IMP Automation & Control Systems Ltd, Serbia, NORTH Protection Ltd and NORTH Control Ltd, both Members of the NORTH Group, Serbia: MC-monitoring SA –  production and delivery of components and assemblies IMP Automation & Control Systems Ltd – project preparation and SCADA/DCS connection NORTH Protection Ltd – installation and commissioning NORTH Control Ltd – quality and quantity control, testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator...
Project HPP-09: EPS, “Lisina” PSP PU-1 and PU-2 Units, Serbia

Project HPP-09: EPS, “Lisina” PSP PU-1 and PU-2 Units,

 

Serbia

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Implementation of Protection and Machinery Monitoring System – “Turnkey Project” Investor: PE Electric Power Industry of Serbia, Belgrade, Serbia Object Name: “Vlasinske HE” Surdulica, “Lisina″ Pumped Storage Plant, PU-1 and PU-2 Units Installed Power/Turbine Type: Two Units, Total 28.6 MW/Francis Object Location: Surdulica, Serbia Brief Project Description: “Lisina″ Pumped Storage Plant has two pumps units. The total installed power of the plant is 28.6 MW. Functional scheme of the plant is given on picture below:   This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two Machinery Monitoring Systems (MMS) by MC-monitoring, CH, type Rhino PMS-300® with Orca CMS-500® software have been completed. Both installed systems function as vibration protection systems independent of SCADA/DCS, but they are also integrated into the plant control system as well. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. Orca CMS-500® software allows operators to monitor the dynamic state of the plant in real time, as well as archiving and analysis of characteristic dynamic parameters. Machinery Monitoring System, for each of the pumps, has 25 channels, which include monitoring the following dynamic parameters: Bearing absolute vibration number of sensors: 7 according to ISO 10816-5: 2005 Shaft relative vibration, number of sensors: 6 according to ISO 7919-5: 2005 The rotor-stator air-gap, number of sensors: 4 Rotor axial position, number of sensors: 3 Structure absolute vibration, number of sensors: 4 Key phasor/RPM, number of sensor: 1 The project is realized jointly by MC-monitoring SA, Switzerland, ...
Project HPP-08: EP BiH, “Jablanica” HPP A3 and A5 Units, Bosnia and Herzegovina

Project HPP-08: EP BiH, “Jablanica” HPP A3 and A5 Units,

 

Bosnia and Herzegovina

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name:Implementation of Machinery Protection System (MPS) – “Turnkey Project” Investor: PE “Electric Power Industry of Bosnia and Herzegovina”, Sarajevo, Bosnia and Herzegovina Object Name: “Jablanica” HPP, A3 and A5 Units Installed Power/Turbine Type: Six Units, Total 180 MW/Francis Object Location: Jablanica, Bosnia and Herzegovina Brief Project Description: “Jablanica” HPP, A3 and A5 units. This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two Machinery Protection Systems (MPS) by MC-monitoring, CH, type Rhino PMS-300® completed. Both installed systems function as vibration protection systems integrated into the plant control system as well. Protection levels are set according to ISO 7919-5:2005 standard. Machinery Monitoring System, for each of the pumps, has 9 channels, which include monitoring the following dynamic parameters: Shaft relative vibration, number of sensors: 6 according to ISO 7919-5: 2005 Structure absolute vibration, number of sensors: 2 Key phasor/RPM, number of sensor: 1 The project is realized jointly by MC-monitoring SA, Switzerland,  DIT Ltd, Tuzla, Bosnia and Herzegovina, NORTH Protection Ltd and NORTH Control Ltd, both Members of the NORTH Group, Vojvodina, Serbia: MC-monitoring SA –  production and delivery of components, DIT Ltd, Tuzla, Bosnia and Herzegovina – project preparation, MPS and SCADA/DCS connections implemented, NORTH Protection Ltd, Member of NORTH Group – assemblies, installation, commissioning and MPS and SCADA/DCS connection implemented, NORTH Control Ltd, Member of NORTH Group – quality and quantity control, testing, functional control and settings Below is a schematic map of units and topology of sensors...
Project HPP-07: EPS, “Vrla 4″ HPP 4A and 4B Units,  Serbia

Project HPP-07: EPS, “Vrla 4″ HPP 4A and 4B Units,

 

Serbia

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Implementation of Protection and Vibration Monitoring System – “Turnkey Project” Investor: Electric Power Industry of Serbia, Belgrade, Serbia Object Name: “Vlasinske HE” Surdulica, “Vrla 4″ Hydro Power Plant, 4A and 4B Units Installed Power/Turbine Type: Two Units, Total 25.4 MW/Francis Object Location: Surdulica, Serbia Brief Project Description: “Vrla 4″ HPP has two units with Francis type turbines. The total installed power of the power plant is 25.4 MW. This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two “Rhino PMS-300” monitoring systems by MC-monitoring have been completed. Both installed systems function as vibration protection systems independent of SCADA/DCS, but they are also integrated into the power plant control system as well. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project is realized jointly by MC-monitoring SA, Switzerland,  IMP Automation & Control Systems Ltd, Serbia, NORTH Protection Ltd and NORTH Control Ltd, both Members of the NORTH Group, Serbia: MC-monitoring SA –  production and delivery of components and assemblies IMP Automation & Control Systems Ltd – project preparation and SCADA/DCS connection NORTH Protection Ltd – installation and commissioning NORTH Control Ltd – quality and quantity control, testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core...
Project HPP-06: EPCG, “Perućica″ HPP,  Montenegro

Project HPP-06: EPCG, “Perućica″ HPP,

 

Montenegro

Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Delivery of Air Gap Sensors for Condition Monitoring System Investor: Electric Power Industry of Montenegro, Niksic, Montenegro Object Name: Perucica HPP Installed Power/Turbine Type: Total 307MW/Pelton Object Location: Niksic, Montenegro Brief Project Description: “Perućica” HPP has seven units with Pelton type horizontal turbines. The total installed power of the power plant is 307MW. The project was implemented as part of the procurement of spare parts (Air Gap Sensors by MC-monitoring) for the existing monitoring systems in “Perućica” HPP. The project is realized jointly by IMP Automatika Ltd,Serbia, NORTH Protection Ltd, Member of the NORTH Group, Serbia and EFusion Ltd, Montenegro.  ...